Sunday 26th February 2017 was the first public operating day of the full length of Manchester's Second City Crossing (2CC) - between St Peter's Square, Exchange Square and Victoria.
Interestingly there was almost no driver training along the route, and no shadow running, the route learning being done on a simulator.
Interestingly there was almost no driver training along the route, and no shadow running, the route learning being done on a simulator.